Bryn Mawr College

(Bryn Mawr, PA)

  • Bryn Mawr College
  • 2021
  • Completed over 22,500 SY of milling and overlay paving work across campus, including over 3,900 LF of asphalt pathways.

Tiburon

(Berwyn, PA)

  • Bentley Homes
  • 2020 – Present
  • Completed Prescott Road extension. 1,000 Ft roadway + cul-de-sac install. Site work included road excavation, grading, concrete curb, storm water management, gravity + force main sanitary sewer and water main extension.
  • 12 single home subdivision w/ 1+ acre lots. Lot work included excavation, grading, on-lot infiltration beds, water & sewer laterals, and meter pit installation.

Site Aerial Video:https://vimeo.com/631307396

Ardrossan Estate

Ardrossan Estate

(Villanova, Pa)

  • Pohlig Homes
  • 2016-Present
  • We have worked on 7 of the 15 homes in the Estate.
  • Completed Ivy Lane, a 1,200 foot road with all utilities.

Site work includes excavation, grading, road work, water main, sanitary, and meter pits.

Philly.com Article

St. Georges Condominium

(Ardmore, PA)

  • 2015-2016
  • Site work for (31) high-end condominiums
  • 64 car underground garage

Substantial haul off of unsuitables and replacement. All site work included unclassified excavation, storm sewer, footing excavations, backfield, water & sewer and paving.

Byers Station

(Chester Springs, PA)

  • 2005-2016
  • Toll Brothers, Orleans, K. Hovnanian & Lennar

From the beginning, completed large portion of lots (over 80% of the 600+ homes), work also included walking trails, basin conversion and retrofit work.

St. Georges Storm Tank

(Ardmore, PA)

  • 2015
  • Placed 57 units by 3:00 pm

“Storm tank” module installation prep and install large “storm tank” precast concrete vessels for storm water retention.

Private Estate

(Willistown, PA)

  • 2012-2016
  • Complete site work for new barn
  • Addition to historic house and new main house

Work included demolition, excavation, relocating barn, renovations, storm sewer and retentions and “red stone” top paving.

Euro Motor Cars

(Devon, PA)

  • 2017
  • Devon Park Drive – Euro Motor Cars – Off site Inventory Parking Lot
  • 203 Car Parking Lot
  • Built Under Heavy Utility Transmission Lines
  • Over a Mile of Underground Pipe
  • Storm Management Beds included almost a mile of drainage pipe and 3,000 tons of stone

View Video

Byers Station

(Chester Springs, PA)

  • Byers Station Lennar & Toll Brothers
  • Final phases 2015-2016 and beyond
  • Carriages, singles and townhouses (227 units)

All lot work included excavation, grading, water & sewer laterals, meter pits.