(Chester Springs, PA)
- Byers Station Lennar & Toll Brothers
- Final phases 2015-2016 and beyond
- Carriages, singles and townhouses (227 units)
All lot work included excavation, grading, water & sewer laterals, meter pits.
-
(Devon, PA)
- 2017
- Devon Park Drive – Euro Motor Cars – Off site Inventory Parking Lot
- 203 Car Parking Lot
- Built Under Heavy Utility Transmission Lines
- Over a Mile of Underground Pipe
- Storm Management Beds included almost a mile of drainage pipe and 3,000 tons of stone
-
(Willistown, PA)
- 2012-2016
- Complete site work for new barn
- Addition to historic house and new main house
Work included demolition, excavation, relocating barn, renovations, storm sewer and retentions and “red stone” top paving.
-
(Ardmore, PA)
- 2015
- Placed 57 units by 3:00 pm
“Storm tank” module installation prep and install large “storm tank” precast concrete vessels for storm water retention.
-
(Chester Springs, PA)
- 2005-2016
- Toll Brothers, Orleans, K. Hovnanian & Lennar
From the beginning, completed large portion of lots (over 80% of the 600+ homes), work also included walking trails, basin conversion and retrofit work.
-
(Ardmore, PA)
- 2015-2016
- Site work for (31) high-end condominiums
- 64 car underground garage
Substantial haul off of unsuitables and replacement. All site work included unclassified excavation, storm sewer, footing excavations, backfield, water & sewer and paving.
-
Ardrossan Estate
(Villanova, Pa)
- Pohlig Homes
- 2016-Present
- We have worked on 7 of the 15 homes in the Estate.
- Completed Ivy Lane, a 1,200 foot road with all utilities.
Site work includes excavation, grading, road work, water main, sanitary, and meter pits.
Philly.com Article
-
(Berwyn, PA)
- Bentley Homes
- 2020 – Present
- Completed Prescott Road extension. 1,000 Ft roadway + cul-de-sac install. Site work included road excavation, grading, concrete curb, storm water management, gravity + force main sanitary sewer and water main extension.
- 12 single home subdivision w/ 1+ acre lots. Lot work included excavation, grading, on-lot infiltration beds, water & sewer laterals, and meter pit installation.
Site Aerial Video:https://vimeo.com/631307396
-
(Bryn Mawr, PA)
- Bryn Mawr College
- 2021
- Completed over 22,500 SY of milling and overlay paving work across campus, including over 3,900 LF of asphalt pathways.